Uaru FPSO Mooring Installation Project, Netherlands

Project Name:Uaru Floating Production Storage and Offloading (FPSO) Mooring Installation Project
Weight:200 tons
Duration:Nov 2024 - Jan 2025
Project:Fabrication and supply of chain chutes, mooring installation towers, and omni-directional padeyes
Location:Rotterdam, Netherlands
Client:Jumbo Maritime
Uaru FPSO Mooring Installation Project, Netherlands
  • Preparation of detailed shop drawings
  • Use of S355J2 steel compliant with EN standards and Q355D steel meeting specified requirements
  • Dimensional tolerances executed in accordance with EN ISO 13920-BF
  • Welding procedures performed to ISO 2553:2019, Quality Level B (System B)
  • Workshop trial assembly
  • Surface coating suitable for marine service conditions
  • Packaging compatible with 40-foot container shipment
  • Delivery terms: FCA (Free Carrier)
Tower Fabrication
Tower Fabrication
Tower Surface Coating
Tower Surface Coating
Trial Assembly
Trial Assembly
Painting
Painting
Fabrication & Assembly in Workshop
Fabrication & Assembly in Workshop
Fabrication & Assembly in Workshop
Fabrication & Assembly in Workshop
On-Site Installation of Ship Steel Structures
On-Site Installation of Ship Steel Structures
On-Site Installation of Ship Steel Structures
On-Site Installation of Ship Steel Structures