Liquefied Natural Gas (LNG) Project, Canada
Weight:1,200 tons
Duration:Dec 2019 - May 2021
Project:Supply, fabrication, and delivery of barge ramps and lifting beams, tower maintenance platforms, and other temporary steel structures
Location:Kitimat, Canada
Client:BJM Joint Venture (BJM JV)



- Preparation of detailed workshop fabrication drawings
- Raw material re-inspection in compliance with CSA G40.20/G40.21 requirements
- Welding operations performed in accordance with CSA W47.1 and CSA W59 standards
- Fabrication of structural steel and plate assemblies with in-workshop trial assembly
- Surface coating and painting
- Packaging suitable for barge transport and container shipment
- Delivery terms: CIF to Prince Rupert Port or designated anchorage