Liquefied Natural Gas (LNG) Project, Canada

Weight:1,200 tons
Duration:Dec 2019 - May 2021
Project:Supply, fabrication, and delivery of barge ramps and lifting beams, tower maintenance platforms, and other temporary steel structures
Location:Kitimat, Canada
Client:BJM Joint Venture (BJM JV)
Liquefied Natural Gas (LNG) Project, Canada
Assembly Diagram
Assembly Diagram
Segmented Assembly
Segmented Assembly
Lifting Beam
Lifting Beam
  • Preparation of detailed workshop fabrication drawings
  • Raw material re-inspection in compliance with CSA G40.20/G40.21 requirements
  • Welding operations performed in accordance with CSA W47.1 and CSA W59 standards
  • Fabrication of structural steel and plate assemblies with in-workshop trial assembly
  • Surface coating and painting
  • Packaging suitable for barge transport and container shipment
  • Delivery terms: CIF to Prince Rupert Port or designated anchorage
Material Cutting
Material Cutting
Weld NDT Inspection
Weld NDT Inspection
Surface Coating
Surface Coating
Paint Thickness Inspection
Paint Thickness Inspection
Coating Training
Coating Training
Trial Assembly
Trial Assembly
Post-Coating Re-Assembly
Post-Coating Re-Assembly
Container Loading
Container Loading
Port Lifting
Port Lifting
Container Loading
Container Loading
On-Site Installation
On-Site Installation
On-Site Installation
On-Site Installation