Oyu Tolgoi Underground Copper Mine Project, Mongolia

Weight:1,500 tons
Duration:8 months
Project:Supply of structural steel and plate assemblies
Location:Oyu Tolgoi, Mongolia
Client:Jacobs Engineering
Oyu Tolgoi Underground Copper Mine Project, Mongolia
  • Fabrication executed in accordance with AWS D1.1 based on approved workshop drawings
  • Raw materials procured to Chinese national (GB) standards
  • Trial assembly of chutes and structural steel components in workshop
  • Packaging and delivery by truck transport
  • Delivery terms: Ex-Works (Yinglong Workshop)
Chute
Chute
Chute
Chute
Chute
Chute
Chute
Chute
Structural Steel Assembly
Structural Steel Assembly
Structural Steel Assembly
Structural Steel Assembly
Belt Conveyor
Belt Conveyor
Transfer Station
Transfer Station
Conveyor Walkway
Conveyor Walkway
Belt Conveyor
Belt Conveyor