Brisbane Centenary Bridge Upgrade Project, Australia

Weight:1,600 tons
Duration:Nov 2023 - June 2025
Project:Fabrication and delivery of gantry crane girders, pile supports, pile caps, and access walkways
Location:Brisbane, Australia
Client:Georgiou-BMD Joint Venture (GBJV)
Brisbane Centenary Bridge Upgrade Project, Australia
  • Preparation of detailed workshop fabrication drawings
  • Use of raw materials compliant with both Chinese (GB) and Australian (AS) standards
  • Welding procedures executed in accordance with AS 1554
  • Fabrication of structural steel with in-workshop trial assembly
  • Partial surface coating works
  • Packaging suitable for barge and container shipment
  • Delivery terms: FCA (Free Carrier)
Fabrication in Workshop
Fabrication in Workshop
Fabrication in Workshop
Fabrication in Workshop
A-Frame Pre-Assembly
A-Frame Pre-Assembly
Boom Girder Pre-Assembly
Boom Girder Pre-Assembly
Assembly Gap Inspection
Assembly Gap Inspection
Handrail Pre-Assembly
Handrail Pre-Assembly
Delivery to Port
Delivery to Port
Loading for Shipment
Loading for Shipment