Boston Barrier Project, United Kingdom

Quantity:440 tons
Duration:October 2020 – July 2021
Project Name:Boston Barrier Flood Defence Project
Project:Fabrication and delivery of stoplogs, lift beams, and storage racks
Location:Boston, United Kingdom
Clients:BMM Joint Venture (UK), BAM Nuttall, and Mott MacDonald
Boston Barrier Project, United Kingdom
Boston Barrier Project, United Kingdom
Boston Barrier Project, United Kingdom
Boston Barrier Project, United Kingdom
  • Procurement of raw materials, including EN S355J2 structural steel, K2-grade steel, SS316L stainless steel, rubber sealing elements, and hydraulic jacks
  • Preparation of detailed shop drawings
  • Fabrication of structural steel and plate assemblies with in-workshop trial assembly
  • Machining works, trial assembly, and leak testing
  • Surface coating operations
  • Packaging suitable for 40-foot flat rack (40FR) container shipment
  • Delivery terms: CFR Felixstowe Port, United Kingdom
EN Standard Raw Materials
EN Standard Raw Materials
Material Cutting
Material Cutting
Surface Coating
Surface Coating
Welding
Welding
Stoplog Machining
Stoplog Machining
Lift Beam Load Testing
Lift Beam Load Testing
Lift Beam Load Testing
Lift Beam Load Testing
Leak Test
Leak Test
Port Lifting
Port Lifting
Loading for Shipment
Loading for Shipment
Installation of PE Panels
Installation of PE Panels
Installation of Rubber Seals
Installation of Rubber Seals
Packaging
Packaging
Shipment
Shipment