Boston Barrier Project, United Kingdom
Quantity:440 tons
Duration:October 2020 – July 2021
Project Name:Boston Barrier Flood Defence Project
Project:Fabrication and delivery of stoplogs, lift beams, and storage racks
Location:Boston, United Kingdom
Clients:BMM Joint Venture (UK), BAM Nuttall, and Mott MacDonald



- Procurement of raw materials, including EN S355J2 structural steel, K2-grade steel, SS316L stainless steel, rubber sealing elements, and hydraulic jacks
- Preparation of detailed shop drawings
- Fabrication of structural steel and plate assemblies with in-workshop trial assembly
- Machining works, trial assembly, and leak testing
- Surface coating operations
- Packaging suitable for 40-foot flat rack (40FR) container shipment
- Delivery terms: CFR Felixstowe Port, United Kingdom













